Campaigning for the positive and sustainable development of Radstock

Documents

These documents are in pdf format. If you are unable to read them, please download the free reader.

Legal Challenge to BANES' decision to remove the Jubilee Oak

Following BANES' announcement that they intend trying to remove the Jubilee Oak from the centre of town, Radstock Action Group has sought legal advice.
799Kb pdf [ Download full text ]

Response to Victoria Hall Consultation - 11th June 1012

Radstock Action Groups' response to the consultation on the future of Victoria Hall. A fuller statement will be submitted to B&NES and will take into account the strategic planning issues of the Core Strategy, the National Planning Policy Framework (NPPF) and the Local Plan.
167Kb pdf [ Download ]

Text of BANES Press Release on the Road Proposals 27.06.2011

62Kb pdf [ Download ]

David Trigwells' Powerpoint Presentation

David Trigwells' PowerPoint presentation, used during the RAG meeting of the 14th January 2009 to illustrate and explain Bath & North East Somerset's Core Strategy.
10Mb ppt [ Download ]

Response to Planning Application 08/02332/RES in relation to Railway Land

Radstock Action Group's response to the latest planning application in relation to the Railway Land in Radstock.
228Kb pdf [ Download ]

Importance of New Environmental Impact Assessment

Cam Valley Wildlife Group is arguing that a further EIA is required for NRR/Bellway application 08/02332/RES. 34Kb pdf [ Download ]

B&NES responded to the Wildlife Groups' statement with the following:
"The Council has issued a Screening Opinion on this application in accordance with the Regulations and has determined that a further Environmental Statement is not required."

Response to Planning Application 08/02332/RES

Radstock Action Group's response to the Reserved Matters Planning Application.
174Kb pdf [ Download ]

Petition to European Commission by RAG, July 2008

This document is is five parts. Parts can be viewed/downloaded separately by clicking each document in turn, or you can download all five parts at once by choosing the zip file.

Petition (21Kb pdf) | Appendix A (10Kb pdf) | Appendix B (45Kb pdf) | Appendix C (12Kb pdf) | Appendix D (36Kb pdf) | ZIP (113Kb)

RAG Constitution

42Kb pdf [ Download ]

Core Strategy Response

Radstock Action Groups' response to the BANES Core Strategy document.
55Kb pdf [ Download ]